XWD@ytxingye.com
+270794212773

ELECTRIC LHD

Introduction

Download

WJD-1.5 electric underground mining loader is suitable for 3×3 m mine tunnel. The loader has been greatly improved in terms of operation and maintenance ergonomics. Further improvements in the safety level of the original underground loader make operation and maintenance smoother.

WJD-1.5 cab is rear-mounted, has a good view and is ROPS/FOPS certified to protect the operator. The ergonomically designed cab provides a comfortable operating space.

There is a safety locking pin on the boom of Z-link working mechanics to ensure the safety of the staff during maintenance. Working brake and parking brake are SAHR. Each lubrication point is arranged reasonably for easy maintenance.

Leave Your Message

    captcha